<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>GAS FREE SENECA</title>
	<atom:link href="http://gasfreeseneca.com/?feed=rss2" rel="self" type="application/rss+xml" />
	<link>http://gasfreeseneca.com</link>
	<description></description>
	<lastBuildDate>Wed, 09 May 2012 12:09:36 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.3.1</generator>
		<item>
		<title>Gas Free Seneca Wants to Be Heard</title>
		<link>http://gasfreeseneca.com/?p=403</link>
		<comments>http://gasfreeseneca.com/?p=403#comments</comments>
		<pubDate>Thu, 11 Aug 2011 13:12:16 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://gasfreeseneca.com/?p=403</guid>
		<description><![CDATA[Latest coverage. &#160; Reading Center, N.Y. - Members of the group Gas Free Seneca say their concerns about a possible liquid petroleum gas storage facility, near Seneca Lake, aren&#8217;t being heard. The underground storage facility would be built in the Town of Reading, by the Missouri based Inergy Corporation. Wednesday, at the Reading Town Board Meeting members of Gas Free Seneca were [...]]]></description>
			<content:encoded><![CDATA[<p><a href="http://www.wetmtv.com/news/local/story/Gas-Free-Seneca-Wants-To-Be-Heard/JyZWIA5tlEyMUYEQJrNILQ.cspx">Latest coverage.</a></p>
<p>&nbsp;</p>
<p>Reading Center, N.Y. - Members of the group Gas Free Seneca say their concerns about a possible liquid petroleum gas storage facility, near Seneca Lake, aren&#8217;t being heard.</p>
<p>The underground storage facility would be built in the Town of Reading, by the Missouri based Inergy Corporation.</p>
<p>Wednesday, at the Reading Town Board Meeting members of Gas Free Seneca were planning to voice their concerns about this possible facility to the board.  But they weren&#8217;t allowed.</p>
<p>The board refused to hear any public opinion about the possible liquid petroleum gas storage facility.  This caused members of Gas Free Seneca to walk out on Wednesday’s board meeting.  Gas Free Seneca members we spoke with say they&#8217;re very disappointed.</p>
<p>&nbsp;</p>
]]></content:encoded>
			<wfw:commentRss>http://gasfreeseneca.com/?feed=rss2&#038;p=403</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>GFS In the News</title>
		<link>http://gasfreeseneca.com/?p=88</link>
		<comments>http://gasfreeseneca.com/?p=88#comments</comments>
		<pubDate>Tue, 31 May 2011 19:15:49 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://gasfreeseneca.com/?p=88</guid>
		<description><![CDATA[Article about the hiring of Richard Lippes A newly formed business alliance &#8211; opposing the proposed Kansas City, Mo.-based Inergy Corporation project to store liquid propane gas in salt caverns three miles north of Watkins Glen – announced this week it has hired a well-known attorney to look into ways to stop the project. Attorney [...]]]></description>
			<content:encoded><![CDATA[<p>Article about the <a href="http://www.observer-review.com/news.php?viewStory=2261">hiring of Richard Lippes<br />
</a></p>
<blockquote><p> A newly formed business alliance &#8211; opposing the proposed Kansas City, Mo.-based Inergy Corporation project to store liquid propane gas in salt caverns three miles north of Watkins Glen – announced this week it has hired a well-known attorney to look into ways to stop the project.</p>
<p>Attorney Richard Lippes of Buffalo, best-known for his successful litigation on behalf of homeowners in the Love Canal case, has been hired and is reviewing documents.</p>
<p>“This is an investment to protect our assets,” Lou Damiani, owner of Damiani Wine Cellars said. “We don’t want them (Inergy) to make this the hub of northeast gas distribution.”</p></blockquote>
]]></content:encoded>
			<wfw:commentRss>http://gasfreeseneca.com/?feed=rss2&#038;p=88</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Inergy Doublespeak</title>
		<link>http://gasfreeseneca.com/?p=68</link>
		<comments>http://gasfreeseneca.com/?p=68#comments</comments>
		<pubDate>Tue, 26 Apr 2011 17:35:32 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://gasfreeseneca.com/?p=68</guid>
		<description><![CDATA[When Inergy speaks to Wall Street they say one thing, when they speak to us they say another. In this first video, Inergy CEO John Sherman talks to Wall Street about &#8220;Making Marcellus Happen&#8221; &#160; In this video, William R. Moler, Senior Vice President, Natural Gas Mid Stream Operations says the following: &#8220;This thing is [...]]]></description>
			<content:encoded><![CDATA[<p>When Inergy speaks to Wall Street they say one thing, when they speak to us they say another.</p>
<p>In this first video, Inergy CEO John Sherman talks to Wall Street about &#8220;Making Marcellus Happen&#8221;</p>
<p>&nbsp;</p>
<p><embed type="application/x-shockwave-flash" width="510" height="550" src="http://c.brightcove.com/services/viewer/federated_f8/1079049304" pluginspage="http://www.macromedia.com/shockwave/download/index.cgi?P1_Prod_Version=ShockwaveFlash" swliveconnect="true" seamlesstabbing="false" name="flashObj" base="http://admin.brightcove.com" flashvars="videoId=75891229001&amp;continuousPlay=false&amp;playerId=1079049304&amp;viewerSecureGatewayURL=https://console.brightcove.com/services/amfgateway&amp;servicesURL=http://services.brightcove.com/services&amp;cdnURL=http://admin.brightcove.com&amp;domain=embed&amp;autoStart=false&amp;" bgcolor="#FFFFFF"></embed></p>
<p>In this video, William R. Moler, Senior Vice President, Natural Gas Mid Stream Operations says the following:</p>
<blockquote><p>&#8220;This thing is getting tangled-up with the whole Marcellus drilling debate&#8230; this has nothing to do with Marcellus drilling&#8221;</p></blockquote>
<p><iframe width="480" height="390" src="http://www.youtube.com/embed/DYtuaw_fwKc" frameborder="0" allowfullscreen></iframe><br />
&nbsp;</p>
<p>One of them is telling the truth. Which one do you believe?</p>
]]></content:encoded>
			<wfw:commentRss>http://gasfreeseneca.com/?feed=rss2&#038;p=68</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Inergy&#8217;s Plan</title>
		<link>http://gasfreeseneca.com/?p=12</link>
		<comments>http://gasfreeseneca.com/?p=12#comments</comments>
		<pubDate>Mon, 28 Feb 2011 20:59:14 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://gasfreeseneca.com/?p=12</guid>
		<description><![CDATA[Inergy, LP (Finger Lakes LPG Storage, LLC) based in Kansas City is a pipeline and natural gas storage company with approximately 3,000 employees and annual sales of about $1.8 billion. In 2008, Inergy purchased the U.S. Salt plant on the west side of Seneca Lake approximately 2 miles north of Watkins Glen to “build an [...]]]></description>
			<content:encoded><![CDATA[<p>Inergy, LP (Finger Lakes LPG Storage, LLC) based in Kansas City is a pipeline and natural gas storage company with approximately 3,000 employees and annual sales of about $1.8 billion.<br />
In 2008, Inergy purchased the U.S. Salt plant on the west side of Seneca Lake approximately 2 miles north of Watkins Glen to “build an integrated gas storage and transportation hub in the Northeast.”</p>
<p>Details of the Inergy proposal include:</p>
<ul>
<li>Construct and operate a new underground LPG storage facility for the storage and distribution of propane and butane on a portion of a 576 acre site near the intersection of Rts. 14 and 14A in the Town of Reading.</li>
<li>Proposed storage capacity of 2.10 million barrels (88.20 million gallons)</li>
<li>Construction of a 14 acre brine pond located on a steep slope just above Seneca Lake with a capacity of 91.8 million gallons.</li>
<li>Construction of a new rail and truck LPG transfer facility consisting of:  A 6 track rail siding capable of allowing loading/unloading of 24 rail cars every 12 hours 24/7/365.  A truck loading station capable of loading 4 trucks per hour (with the possibility to expand) 24/7/365.</li>
<li>Construction also to include surface works consisting of truck and rail loading terminals, LPG storage tanks, offices and other distribution facilities and stormwater control structures.</li>
</ul>
<p>Please refer to the <a href="http://gasfreeseneca.com/?page_id=5">“Resources”</a> page for more detailed information on the project and its potentially devastating environmental consequences.</p>
<p>To stay informed please join the <a href="http://groups.yahoo.com/group/gasfreeseneca/members?group=sub&amp;start=0">Gas Free Seneca Listserv. </a></p>
<p>&nbsp;</p>
<p>&nbsp;</p>
]]></content:encoded>
			<wfw:commentRss>http://gasfreeseneca.com/?feed=rss2&#038;p=12</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

